A practical building guide
-
Carefully study the architectural and other building guidelines as found on the website www.sabiriverecoestate.com under the ESTATE tab
-
Submit 3 full sets of the building plans to the Estate office for approval.
-
Once approved, one set to be retained by the Estate with the balance to be submitted to the Estate appointed architects and then to Mbombela for final approval
-
Ensure that the required 6 indigenous tree planting positions are recorded on the site plan.
-
Contact an Estate approved building contractor for a quotation.
-
Proof of sufficient funding must be guaranteed as per the contractor quotation.
-
The quote must include “full service” to handover of the official Mbombela occupation certificate by the municipal building inspector.
-
Arrange a meeting with the appointed contractor and the Estate manager to sign and receive Handover Document and Codes of Conduct guidelines.
-
Owners must ensure boundary peg positions are verified by survey.
-
Building must be completed within 12 months of the Handover Document date to avoid penalties that could be imposed.
-
As a very rough guide the minimum building cost is currently +/- R7000.00 per sq. metre. A more realistic cost is +/- R8000.00 – R9000.00 depending on the quality of finishing that is chosen. Therefore as an example a 300 sq. metre home would require that an owner guarantee +/- R2.1million as a minimum before building would be allowed to begin.
If required, additional information can be obtained from the Estate manager’s office via e-mail seehoa@mweb.co.za